Sherwood Street

We were required to provide a solution for providing maximum site space without impacting the roadway and pedestrian access.

The Outcome

We designed a heavy duty cantilever gantry above the roadway allowing for a 10.00kN/m2 stone loading. We created this design you Revit to ensure we removed clashes during the project life cycle.